tech

Thames Water forced to fork out £250,000 as botched smart meter installations blamed for thousands of leaks

Andy Burnham offers £5m in aid to Nepal amid urgent search for missing Britons

Thames Water forced to fork out £250,000 as botched smart meter installations blamed for thousands of leaks

TL;DR

  • Thames Water has paid £250,000 in compensation for smart meter installation errors since 2023.
  • Botched installations have caused nearly 2,500 water leaks affecting customers over the last five years.
  • Faulty fitting work is the main cause of leaks, with only a small number attributed to defective meters.
  • The company has installed over 200,000 smart meters in London and surrounding areas in the past year.
  • Smart meters are intended to track water consumption and help customers monitor usage, but some fear surge pricing or penalties.
  • Thames Water's existing pipe network leaks approximately 570 million litres of water daily.
  • Installation work is contracted to Morrison Water Services, and meters are manufactured by Honeywell.
  • Compensation payouts and leak problems occur as customers face a 40% bill increase from last year.
  • Campaigners like Britain Against Smart Meters oppose installations, citing lack of consent.